If you are interested in our services or products, you can contact us directly. We look forward to collaborating with you!The TRD method, also known as the continuous mixing wall method under uniform thickness cement soil, is based on the principle that a chainsaw tool box is vertically driven into the stratum and then moves horizontally laterally. At the same time, the chain drives the tool to rotate up and down, stirring and mixing the original soil and injecting cement slurry to form a waterstop wall of a certain strength and uniform thickness. The TRD construction method was developed and researched in Japan in the early 1990s. It is a complete set of advanced construction equipment and methods that can continuously form walls in various soil layers and gravel layers. It is mainly applied in various construction projects, underground projects, bank protection projects, foundation reinforcement of DAMS and embankments, and anti-seepage treatment, etc.